← 1230.pdf_v_d07242026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
US 92 (Dale Mabry Highway) Intersection Improvements at Steinbrenner Drive 458144-1-52-01
| Project Details | |
| Work Type | IntersectionImprovements |
|---|---|
| Phase | Design |
| Limits | US 92 (Dale Mabry Highway)at Steinbrenner Drive |
| Length | 0.10 miles |
| City | Tampa |
| County | Hillsborough |
| Road | Dale Mabry HighwaySR 600US 92 |
About
This project includes a new traffic signal and pedestrian crosswalks at the intersection of US 92 (Dale Mabry Highway) and Steinbrenner Drive.
Construction activities are expected to begin 2027.
Contact Information
Design Manager
Eyra Cash
813-975-6164
Eyra.Cash@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us