| Project Details |
| Work Type | IntersectionImprovements |
|---|
| Phase | Design |
|---|
| Limits | US 92 (Dale Mabry Highway)at Steinbrenner Drive |
|---|
| Length | 0.10 miles |
|---|
| City | Tampa |
|---|
| County | Hillsborough |
|---|
| Road | Dale Mabry HighwaySR 600US 92 |
|---|
This project includes a new traffic signal and pedestrian crosswalks at the intersection of US 92 (Dale Mabry Highway) and Steinbrenner Drive.
Construction activities are expected to begin 2027.
Contact Information
Design Manager
Eyra Cash
813-975-6164
Eyra.Cash@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us