Page 1
Download HTML
Welcome
to the
LPGA Boulevard
PD&E Study
Alternatives
Open House
For more information regarding the LPGA Boulevard PD&E Study, please scan the QR code or visit www.cflroads.com/project/448456-1.
February 28, 2023
Page 2
Download HTML
NEPA Assignment
National Environmental Policy Act (NEPA)
The environmental review, consultation, and other actions required by applicable federal environmental laws for this project are being, or have been, carried out by the Florida Department of Transportation (FDOT) pursuant to 23 U.S.C. ยง 327 and a Memorandum of Understanding dated May 26, 2022 and executed by the Federal Highway Administration and FDOT.
Page 3
Download HTML
TITLE VI COMPLIANCE
Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability, or family status. Persons wishing to express concerns relative to FDOT compliance with Title VI may do so by contacting:
Melissa McKinney
District Five Title VI Coordinator
719 South Woodland Boulevard, MS
501 DeLand, Florida 32720-6834
386-943-5077
melissa.mckinney@dot.state.fl.us
Stefan Kulakowski, FCCM, CPM
State Title VI Coordinator
605 Suwannee Street, MS 65
Tallahassee, Florida 32399-0450
850-414-4742
stefan.kulakowski@dot.state.fl.us
Stefan Kulakowski, FCCM, CPM
State Title VI Coordinator
605 Suwannee Street, MS 65
Tallahassee, Florida 32399-0450
850-414-4742
stefan.kulakowski@dot.state.fl.us
All inquiries or concerns will be handled according to FDOT procedure and in a prompt and courteous manner.
Page 4
Download HTML
PROJECT OVERVIEW
Daily Traffic Volumes
Purpose and Need
Accommodate future transportation demand, including bicyclists and pedestrians
Enhance safety for LPGA
Boulevard and I-95 Interchange
The Study is Evaluating
Widening LPGA Boulevard
Adding shared use paths for
bicyclists and pedestrians
Replacing and widening the Tomoka River Bridge
Redesigning major intersections
Redesigning the I-95 interchange to a Signalized Turbine Interchange
Adding stormwater ponds
Safety Conditions
Page 5
Download HTML
PROPOSED TOMOKA RIVER BRIDGE
Page 6
Download HTML
PROPOSED I-95 INTERCHANGE
Page 7
Download HTML
EVALUATION MATRIX
| EVALUATION CRITERIA | NO BUILD ALTERNATIVE | BUILD ALTERNATIVE |
|---|---|---|
| Purpose and Need | ||
| Accommodate Future Travel Demand | No | Yes |
| Improve Safety | No | Yes |
| Right-of-Way Impacts | ||
| Number of Parcels Impacted | 0 | 4 |
| Number of Residential Relocations | 0 | 0 |
| Number of Business Relocations | 0 | 0 |
| Potential Environmental Impacts | ||
| Protected Species | 0 | 1 |
| Archaeological Potential | None | Low |
| Historic Sites | 0 | 0 |
| Contamination Sites | 0 | 1 |
| Wetlands (Acres) | 0 | 42 |
| Floodplains (Acres) | 0 | 0.16 |
| Public Lands (Acres) | 0 | 0 |
| Noise Sensitive Sites | None | 135 |
| Estimated Costs in Millions (Present Day Costs) | ||
| Right of way | No cost | $10.7 |
| Wetland Mitigation | No cost | $1.9 |
| Construction Engineering and Inspection | No cost | $13.4 |
| Construction Cost | No cost | $191.9 |
Project costs are subject to change
Page 8
Download HTML
PROJECT SCHEDULE
| 2021 | 2022 | 2023 | |||||||
| PROJECT MILESTONE/ACTIVITY | October - December | January - March | April - June | July - September | October - December | January - March | April - June | July - September | October - December |
| Begin Study | ![]() | ||||||||
| Data Collection | |||||||||
| Project Advisory Group Meetings | ![]() | ![]() | ![]() | ![]() | |||||
| Analyze and Refine Viable Alternatives | Today's Alternatives Open House | ||||||||
| Alternatives Open House | ![]() | ||||||||
| Refine and Select the Recommended Alternative | |||||||||
| Prepare Documents | |||||||||
| Public Hearing | |||||||||
| PD&E Study Approval | ![]() | ||||||||
| Public/Stakeholder Engagement | |||||||||
Note: The schedule is tentative and subject to change
Page 9
Download HTML
Thank You
for attending
LPGA Boulevard
PD&E Study
Alternatives
Open House
For more information regarding the LPGA Boulevard PD&E Study, please scan the QR code or visit www.cflroads.com/project/448456-1.