← 905.pdf_v_d10162025.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
US 19 (Commercial Way) New Traffic Signal at Centralia Road in Hernando County
254677-5-29
| Project Details | |
| Work Type | New Traffic Signal |
|---|---|
| Phase | Completed |
| Project Start | January 9, 2023 |
| City | Brooksville |
| County | Hernando |
| Road | US 19 |
| Construction Cost | $900,000 |
| Estimated Completion | Late 2024 |
| Contractor | Cone & Graham, Inc. |
Contact Information
Project Information
Maddie Griffin
727-575-8334
roadwork@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
As of April 12, 2024, all construction activities associated with this project have been completed.
This project addressed safety improvements with the construction of a new traffic signal at Commercial Way (US 19) at Centralia Road in Hernando County (Brooksville).
Elements of work included, but were not limited to, installation of the signal mentioned above, resurfacing of the roadway, sidewalk construction, and pedestrian features as necessary to accommodate pedestrian traffic with minimum impact to the current vehicular traffic patterns.
Construction activities are complete as of April 12, 2024.
*****
*****
What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously.