US 19 (Commercial Way) New Traffic Signal at Centralia Road in Hernando County 254677-5-29

Project Details
Work TypeNew Traffic Signal
PhaseCompleted
Project StartJanuary 9, 2023
CityBrooksville
CountyHernando
RoadUS 19
Construction Cost$900,000
Estimated CompletionLate 2024
ContractorCone & Graham, Inc.

Contact Information

Project Information Maddie Griffin 727-575-8334 roadwork@dot.state.fl.us

Media Contact Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us

About

As of April 12, 2024, all construction activities associated with this project have been completed.

This project addressed safety improvements with the construction of a new traffic signal at Commercial Way (US 19) at Centralia Road in Hernando County (Brooksville).

Elements of work included, but were not limited to, installation of the signal mentioned above, resurfacing of the roadway, sidewalk construction, and pedestrian features as necessary to accommodate pedestrian traffic with minimum impact to the current vehicular traffic patterns.

Construction activities are complete as of April 12, 2024.

***** *****

What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously.