Tampa Bay Florida Department of Transportation
US 41B (Causeway Boulevard) Corridor Lighting Retrofit from SR 60 (Adamo Drive) to US 41/50th Street 254677-6-12
Project Details
Work TypeSafety Improvements
PhaseCompleted
Limitsfrom SR 60 (Adamo Drive) to US 41/50th Street
Project StartJune 9, 2025
Length3.75 miles
CityTampa
CountyHillsborough
RoadUSB 41
Construction Cost$480,000
Estimated CompletionSummer 2025
ContractorCone & Graham, Inc.
Contact Information
Project Information Maddie Griffin 727-575-8334 Maddie.Griffin@dot.state.fl.us
Media Contact Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us
About
As of July 5, 2025, all construction activities associated with this project have been completed.
The Florida Department of Transportation's Design-Build firm, Cone & Graham, Inc., is making roadway lighting improvements to US 41B (Causeway Boulevard) from SR 60 (Adamo Drive) to US 41/50th Street in Hillsborough County.
Safety improvements include installing new light poles and retrofitting existing light poles along USB 41.
Construction activities are expected to be complete in summer 2026.
***** *****
What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously.