US 41B (Causeway Boulevard) Corridor Lighting Retrofit from SR 60 (Adamo Drive) to US 41/50th Street 254677-6-12
| Project Details |
| Work Type | Safety Improvements |
|---|
| Phase | Completed |
|---|
| Limits | from SR 60 (Adamo Drive) to US 41/50th Street |
|---|
| Project Start | June 9, 2025 |
|---|
| Length | 3.75 miles |
|---|
| City | Tampa |
|---|
| County | Hillsborough |
|---|
| Road | USB 41 |
|---|
| Construction Cost | $480,000 |
|---|
| Estimated Completion | Summer 2025 |
|---|
| Contractor | Cone & Graham, Inc. |
|---|
Contact Information
Project Information
Maddie Griffin
727-575-8334
Maddie.Griffin@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
As of July 5, 2025, all construction activities associated with this project have been completed.
The Florida Department of Transportation's Design-Build firm, Cone & Graham, Inc., is making roadway lighting improvements to US 41B (Causeway Boulevard) from SR 60 (Adamo Drive) to US 41/50th Street in Hillsborough County.
Safety improvements include installing new light poles and retrofitting existing light poles along USB 41.
Construction activities are expected to be complete in summer 2026.
*****
*****
What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously.