← 1017.pdf_v_d04032026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
SR 52 Resurfacing From E. of Hicks Rd. to W. of Moon Lake Rd. 449173-1-32-01
| Project Details | |
| Work Type | Resurfacing, Intersection Enhancements, Safety Improvements |
|---|---|
| Phase | Design |
| Limits | From E. of Hicks Rd. To W. of Moon Lake Rd. |
| Length | 2.9 Miles |
| City | Hudson New Port Richey |
| County | Pasco |
| Road | SR 52 |
Contact Information
Design Manager
Anh-Thu Nguyen
813-975-6179
Anh-Thu.Nguyen@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of State Road 52 in Pasco County.
In addition to resurfacing, the project also includes minor drainage improvements, ADA facility upgrades, as well as general corridor safety modification work.
Other improvements include intersection lighting and intersection upgrades, signing and pavement markings, and a traffic signal warrant analysis at the SR 52/Shadow Ridge Blvd. intersection.
Construction is currently anticipated to begin in 2027.