Tampa Bay Florida Department of Transportation
SR 52 Resurfacing From E. of Hicks Rd. to W. of Moon Lake Rd. 449173-1-32-01
Project Details
Work TypeResurfacing, Intersection Enhancements, Safety Improvements
PhaseDesign
LimitsFrom E. of Hicks Rd. To W. of Moon Lake Rd.
Length2.9 Miles
CityHudson New Port Richey
CountyPasco
RoadSR 52
Contact Information
Design Manager Anh-Thu Nguyen 813-975-6179 Anh-Thu.Nguyen@dot.state.fl.us
Media Contact Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of State Road 52 in Pasco County.
In addition to resurfacing, the project also includes minor drainage improvements, ADA facility upgrades, as well as general corridor safety modification work.
Other improvements include intersection lighting and intersection upgrades, signing and pavement markings, and a traffic signal warrant analysis at the SR 52/Shadow Ridge Blvd. intersection.
Construction is currently anticipated to begin in 2027.