← 1026.pdf_v_d10062026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
US 19 Resurfacing from north of NW 7th Ave to south of the Withlacoochee River bridge
447928-1-52-01
| Project Details | |
| Work Type | Resurfacing |
|---|---|
| Phase | Design |
| Limits | from north of NW 7th Ave to south of the Withlacoochee River Bridge |
| Length | 9.479 Miles |
| City | Crystal River |
| County | Citrus |
| Road | US 19 |
Contact Information
Design Manager
Dinyar Sharifabad
813-975-6172
Dinyar.Sharifabad@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This project will repave US 19 from north of NW 7th Avenue to south of the Withlacoochee River bridge in Citrus County.
The project is currently in the design phase.
Construction is anticipated to begin summer of 2027.