| Project Details |
| Work Type | Resurfacing |
|---|
| Phase | Design |
|---|
| Limits | from north of NW 7th Ave to south of the Withlacoochee River Bridge |
|---|
| Length | 9.479 Miles |
|---|
| City | Crystal River |
|---|
| County | Citrus |
|---|
| Road | US 19 |
|---|
Contact Information
Design Manager
Dinyar Sharifabad
813-975-6172
Dinyar.Sharifabad@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
This project will repave US 19 from north of NW 7th Avenue to south of the Withlacoochee River bridge in Citrus County.
The project is currently in the design phase.
Construction is anticipated to begin summer of 2027.