Highlands County Feasibility Study Public Meeting September 17, 2024

FPID #: 449503-1

WHY A HIGHLANDS COUNTY FEASIBILITY STUDY

Regional Growth

  • Centrally located between major metropolitan areas
  • Proactively planning to accommodate future growth

Safety and Mobility Challenges

  • Increased truck traffic
  • Conflicts with pedestrians/bicycles
  • Limited evacuation and detour routes

FEASIBILITY STUDY

DISTRICT ONE

Highlands County FEASIBILITY STUDY FPID: 449503-1

SEPTEMBER 2024 DRAFT

Scope:

US 27 from CR 17 to SR 17 in Highlands County

Assess need for future improvements within Highlands County with a focus on:

Safety to identify high crash locations

Traffic to evaluate capacity additions

Freight movement

Alternative route for detours and evacuation Local plan review to ensure consistency

Highlands County Feasibility Study Findings

POPULATION TRENDS

Highlands County is expected to see a 54% increase in population.

SAFETY FREIGHT

EVACUATION/DETOURS

12 miles of US 27 have crash rates above the statewide rate.

US 27 serves as a major freight corridor carrying up to 43% truck traffic. EVACUATION ROUTE

Limited parallel facilities to US 27 exist. Potential 67-minute detour to the nearest alternative route. TRAFFIC CONGESTION

TRAFFIC CONGESTION

Multiple segments of US 27 have more vehicles (up to 20% more) than can be accommodated.

FUTURE YEAR BUILD OUT CONSIDERATIONS

  • Portions of US 27 will be at or near capacity in 2045
  • Increased truck traffic
  • Adding lanes to US 27 will not fix the problem:
  • New development will erode capacity initially gained from additional lanes
  • Impacts up to 304 parcels
  • Estimated project cost: $120 million

SAFETY

  • Most crashes are in urbanized areas (Sebring and Avon Park)
  • The fatal crash percentage is four times the national average
  • Lack of continuous bicycle/pedestrian infrastructure identified as a contributing factor
  • Projected crashes with an additional lane:

TOTAL CRASHES DOWN

WRONG-WAY CRASHES UP PEDESTRIAN CRASHES UP

EVACUATION AND DETOURS

  • Regional transportation network does not have the capacity to handle evacuation traffic
  • Lengthy detours if portions of US 27 are closed

DETOUR AND EVACUATION ROUTES

DETOUR 1: SR 64 TO SR 66

Additional Travel Time (mins) 30

Additional Distance (miles) 30.7

DETOUR 2: US 98 TO SR 70

Additional Travel Time (mins) 60

Additional Distance (miles) 55.6

DETOUR 3: SR 70 TO SR 31 to CR 74

Additional Travel Time (mins) 67

Additional Distance (miles) 58.9

FEASIBILITY STUDY RECOMMENDATIONS

SEPTEMBER 2024 DRAFT

FEASIBILITY STUDY > RECOMMENDATIONS

The need for the project is based on:

LAND USE CHANGES

TRAFFIC CONGESTION

SAFETY

PD&E Study from SR 66 to US 98

FEASIBILITY STUDY > RECOMMENDATIONS

The need for the project is based on:

NETWORK RESILIENCY

EMERGENCY EVACUATION

FREIGHT MOBILITY

PD&E Study from SR 70 to SR 66

FEASIBILITY STUDY > RECOMMENDATIONS

็ฅ ๐ŸŒ™ ๐ŸŽ‰

Identify operational improvements on US 27

Integrated adjacent project coordination

Setup for future change in character

Mobility Analysis

Community Engagement

September โ€“ 2024

Highlands County Feasibility Study Public Meeting:

  • In Person โ€“ September 17^{th}
  • Virtual โ€“ September 19^{th}

November 2024 โ€“ May 2025

PD&E Study from SR 66 to US 98

Visioning Workshops

  • In Person & Virtual
  • Four Locations: Two PD&Es & Two Mobility Analysis Visioning Workshops

PD&E Study from SR 70 to SR 66

Workshop Locations

Lake Wales

Sebring

Wauchula

Arcadia

Mobility Analysis

Next Steps

PD&E SR 70 to SR 66 Visioning Workshop In-Person - November 19, 2024 Turner Agri-Civic Center, 2250 NE Roan St, Arcadia, FL 34266

Virtual Self-Guided - November 20 โ€“ December 4, 2024

PD&E SR 66 to US 98 Visioning Workshop โ˜ In-Person / Virtual โ€“ Early 2025 (Location and Dates: TBD)

Mobility Analysis Visioning Workshops โ˜ In-Person / Virtual โ€“ Spring 2025 (Location and Dates: TBD)

For Project Information Contact:

David Long, Project Manager (813) 334-7056 David.Long@dot.state.fl.us Project Website: https://www.swflroads.com/proj