← 487_v_08252026_sa_U_ved_2ahUKEwjv7qDK9_CXAxU6RzABHYibHPIQFnoECAQQAQ_usg_AOvVaw3TSbKsm9xPxnxEaoXi4v00_fexp_122108196,122108195,121847802.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON

Southwest Florida Florida Department of Transportation

State Road 45 (U.S. 41) Resurfacing, Restoration and Rehabilitation from South of State Road 758 (Bee Ridge Road) to South of State Road 683 (U.S. 301)452748-1

Project Details
Work TypeResurfacing
PhaseDesign
LimitsS.R. 45 (U.S. 41/U.S. 41B) from South of S.R. 758 (Bee Ridge Road) to South of S.R. 683 (U.S. 301)
Length1.96 miles

Contact Information

Communications Team

Barbara Catlin

941-302-5048

barbara.catlin@dot.state.fl.us

Design Project Manager

  • Amber Albritton
  • 519-2668
  • amber.albritton@dot.state.fl.us