← 18416-artifacted.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
THE CITY OF BALCH SPRINGS
GROWING COMMUNITY
SEPTEMBER 2026 MONTHLY REPORT
CIP PROJECTS
Complete $11,960,185
Construction $11,628,000
Balch Springs 2050 Comp Plan: $147,185
Mercury Road Improvements (50/50 Project): $1M
Streetscape Improvements Phase One: $150K
Safe Routes to School (SRTS) Sidewalks: $1.2M
City Center Downtown Master Plan Initiative (Elam Rd (I-635 to Pioneer Rd): $113K
Oakridge Park Restroom: $265K
Guy Berry Park Trail $110K
Streetscape Phase Two-Beltline Rd: $150K
HISP Intersection: Peachtree Rd at US175 FR: $143K
Streetscape Improvement Phase One-Mercury Rd- $150K
Woodland Park Fitness Court Shade Structure: $74K
Green Ribbon Gateway I-635 Lake June $820K
Oakridge Park Restroom: $265K
HSIP Intersection: Elam Rd at Shepherd Lane $749K
Elam Rd at Shepherd Lane: Rt Turn Lane $550K
Luedeke Park Splash Pad upgrade Project: Control pane/bucket $40K
Guy Berry Fence Repair Project- $40K
Oakridge Parking Lot Project- $250K
HSIP Intersection Impv Beltline at Mercury-$648K
S Beltline (Lake June to Pioneer Bluffs): $295K
2024 CDBG Street Improvement Project (Greenvalley): $700K
HSIP: Lake June Rd (Amazon private drive to S. Beltline Road): $282K
Intersection: Pioneer Road at McKenzie: $902K
Woodland Park Parking Lot & Soccer Field: $225K
Phase 2 Irwin Park Baseball Field Upgrades: $750K
HSIP Intersection Imprv Lake June at Hickory Tree Rd: $648K
Green Ribbon Gateway I-635 Elam: $694K
<table><tr><td>Ambassador Way Sewer Pipe bursting project: $100K</td></tr><tr><td>Ambassador Way at Seagoville Road Sewer Pipe bursting bridge project: $200K</td></tr><tr><td>FY2024 Water Pipe Bursting: $700K</td></tr><tr><td>FY2024 Waste Water Pipe Bursting: $600K</td></tr><tr><td>2024 SMT Project( Platte; Summerhill; Glenshire; Horseshoe Trl; Spring Oaks Dr): $6.2M</td></tr><tr><td>South Mesquite Creek Sewer Line Upgrade: $2.7M</td></tr><tr><td>HSIP Lake June Rd(Peachtree to Beltline): $951K</td></tr><tr><td>Green Ribbon Gateway I-20 Seagoville: $762K</td></tr><tr><td>Green Ribbon Gateway I-20 Beltline: $762K</td></tr><tr><td>Streetscape Project at Pioneer Rd, Lake June Rd, and Beltline Rd: $400K</td></tr></table>
Planning $2,538,400
Streetscape Phase 2 Lake June $193,400
Elam Rd (Peachtree to Pioneer Rd) Corridor
Re-Design Improvements: $2M
Right turn Project at Beltline and Mercury: $345K
Seeking Funding $78,315,007
HSIP Intersection: Hickory Tree at Elam: $670K
Elam Road: Peachtree Road to Pioneer Rd: $21M
Shepherd Lane: Quail Drive to Seagoville: $17M
Beltline Road: (1-20 to Mercury Road): $17M
McKenzie Rd(Pioneer to Mercury): $22M
HSIP-Peachtree at Seagoville: $800K
Shepherd Lane: Quail Drive to Seagoville: $17M
Beltline Road: (1-20 to Mercury Road): $17M
McKenzie Rd(Pioneer to Mercury): $22M
HSIP-Peachtree at Seagoville: $800K
Design $19,994,792
Hickory Tree Road Agreement: $13.5M
Dallas County MCIP 7th Call for Projects- SE Trail
Phase 1: $3.3M
SS4A: 2023 Safer Streets and Road for All
Program: $200K
HSIP Intersection: Beltline Road (Lake June Rd to I-20) Lighting: $890K
Shepherd Lane Quail Drive to Rec Center $1.5M
HSIP: Lake June at Ranchway $675K
Green Ribbon Gateway I-635 Elam: $694K
Irwin Park Baseball Field Upgrades: $750K
Ambassador Way Sewer Pipe bursting project: $100k
Ambassador Way at Seagoville Road Sewer Pipe bursting bridge project: $200k
FY2024 Water Pipe Bursting: $700k
FY2024 Waste Water Pipe Bursting: $600k
2024 SMT Project (Platte; Summerhill; Glenshire; Horseshoe Trl; Spring Oaks Dr): $6.2M
South Mesquite Creek Sewer Line Upgrade: $2.7M
HSIP Lake June Rd (Peachtree to Beltline): $951K
Green Ribbon Gateway I-20 Seagoville: $762K
Green Ribbon Gateway I-20 Beltline: $762K
Streetscape Project at Pioneer Rd, Lake June Rd, and Beltline Rd: $400K
Page 2
Download HTML
THE CITY OF BALCH SPRINGS CIP PROJECT INVESTMENT
GROWING COMMUNITY
SEPTEMBER 2026
CIP Investment-September 2026