← 1260.pdf_v_d11042026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON
Page 1
Download HTML
US 92 (Baker Street) Railroad Crossing Replacement 437819-1-52-01
| Project Details | |
| Work Type | Replacement of Railroad Crossing |
|---|---|
| Phase | Design |
| Limits | west of N Michigan Avenue |
| Length | 0.02 miles |
| City | Plant City |
| County | Hillsborough |
| Road | Baker Street US 92 |
Contact Information
Design Manager
Lauren Blakeley
813-975-3669
Lauren.Blakeley@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to replace the existing railroad crossing. This project will include repaving US 92 on both sides of the crossing and upgrading pavement markings on the approach to the railroad.
Construction is anticipated to begin in 2027.