← 1261.pdf_v_d11042026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON
Page 1
Download HTML
US 41B Railroad Crossing Replacement between E Long Street and E Adamo Drive 437824-1-52-01
| Project Details | |
| Work Type | Railroad Crossing Replacement |
|---|---|
| Phase | Design |
| Limits | between E Long Street and E Adamo Drive |
| Length | 0.04 miles |
| City | Tampa |
| County | Hillsborough |
| Road | US 41 Business |
About
The purpose of this project is to replace the existing railroad crossing. This project will include repaving US 41 on either side of the crossing and upgrading pavement markings on the approach to the railroad.
Contact Information
Design Manager
Lauren Blakeley
813-975-3669
Lauren.Blakeley@dot.state.fl.us
Construction is anticipated to begin in 2027.
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us