← 1265.pdf_v_d11042026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON

US 19 (Suncoast Boulevard) Sidewalk Improvements from W Ashburn Lane to N Champion Point 450972-2-52-01

Project Details
Work TypeSidewalk
PhaseDesign
Limitsfrom W Ashburn Lane to N Champion Point
Length0.37 miles
CityHomosassa
CountyCitrus
RoadSR 55 Suncoast Boulevard US 19

Contact Information

Design Manager

Stephanie Wolchok 813-975-6244

Stephanie.Wolchok@dot.state.fl.u

Media Contact

Kayla Mejia 813-975-6060

Kayla.Mejia@dot.state.fl.us

About

The purpose of this project is to construct a 5-foot-wide sidewalk on the northbound side of US 19 from W Ashburn Lane to N Champion Point.

Construction is anticipated to begin summer of 2028.