Jackson Township Environmental Commission
Meeting of
April 16, 2019
Minutes
Chairman Jeff Riker called the meeting to order at 7:33 pm followed by a flag salute and reading of compliance with the Open Public Meetings Act (N.J.S.A. 10:4)
Present: J. Myer K. Skibo, S. DeMarzo, J. Riker
Absent: B. Krubner, M. McClary, L. Cromwell
Minutes of March 19, 2019 โ Motion to approve made by J. Myer, second by S. DeMarzo
Vote: J. Myer, K. Skibo, S. DeMarzo, J. Riker โ Ayes
Block 3101 Lots 1, 38-43 & Block 10801 Lots 1-7 and 20-24 Trophy Park, Inc. Rte. 537 Maser
Consulting PA Proposed Sports Complex One (1) set of General Development Plans and One (1) Copy EIS, One (1) Copy of Land Development Application, One (1) Copy of Project Narrative
Mr. Riker stated this project consists of a proposed sports complex, including a stadium, restaurants, hotel, dormitory suites. Zoning Board approved General Development Plan only at its last meeting. The applicant will now return to the Planning Board for the Preliminary and Final Plans. The Commission will review the plans as submitted to the Planning Board, along with the EIS, Storm water Management Plan.
Block 2301 Lot 10 498 Herman Road Houser Engineering, LLC Preliminary & Final Site Plan Applicant: 498 Herman, LLC c/o Herman Taussig
Proposed office / warehouse construction. Mr. Riker and Mr. Egan took the plans for review. Mr. Riker noted that per the Planning Board, the building size must be reduced. The applicant has submitted LOI, Survey, Preliminary and Final Major Site Plan. The current plans have been scaled down from the original. Motion to send a Letter of No Concern made by J. Riker, second by J. Myer
Commission Vote: J. Myer, K. Skibo, S. DeMarzo, J. Riker โ Ayes
Block 2501 Lot 3 West Commodore Blvd. PDS Preliminary & Final Major Site Plans for Proposed Warehouse and Office. Two (2) copies of Environmental Impact Statement, two (2) copies of Storm Water report and two (2) copies of Site Plan. Mr. Riker and Mr. DeMarzo took the plans for review. Mr. Riker stated this is a large project consisting of three buildings. Possible traffic issues involved. The Planning Board approved the application with restrictions (no shipping/receiving on the third shift). Mr. Riker did a site inspection and observed a young forest on the site. EIS and Storm water Management have been received. Mr. Myer has concerns that the roadway is only 30' in width, 18 wheelers will have trouble parking. Mr. Riker stated it has been expanded. Mr. Myer also has concerns that the storm water basin has no drain, everything drains into the basin. The perk rate is listed as 6" per hour, this seems very high. The EIS is very generic in nature. The work hours are listed as 7 am to 6 pm Monday through Saturday. Mr. Riker stated the hours have been covered in the Resolution. The project is stated as "light manufacturing". There will be no yard truck. Mr. Myer stated the applicant states the storm water basin will percolate faster than the existing forest. The plans contradict the EIS in that the plans state the property slopes North to South and the EIS states that it slopes West to North.
Motion by S. DeMarzo, second by J. Riker to send a Letter of Concern as follows:
Please detail over flow drain for the storm water basin
Please provide soil boring logs to support claim that the basin will percolate water greater than 6" per hour as indicated in the Storm Water Management Plan.
Page 2
Download HTML
Please clarify: the Environmental Impact Statement states the property slopes West to North and the Plans show the property sloping North to South.
Kindly furnish supporting documentation for your claim of noise at the site.
Provide supporting documentation for Endangered Species in the area.
Provide supporting documentation that match the operating hours as indicated during the Planning Board meeting of April 15, 2019.
Commission Vote: J. Myer, K. Skibo, S. DeMarzo, J. Riker โ Ayes
Block 3001 / Lots 2, 3 & 4 Adventure Crossing PDS Preliminary & Final Major Site Plan - Lots 3 & 4 Two sets of Site Plans, Two (2) Copies of Stormwater Management Report & Two (2) Copies of Environmental Impact Statement. Mr. Cromwell and Ms. Skibo will take the EIS and Stormwater Management Reports for review. PDS will be asked for copies of the site plans. Mr. Cromwell stated that PDS will be sending the plans to the Township Clerk's office. Lonnie Cromwell has the plans. Table to next meeting.
Block 23103 / Lot 17 Vath Street Morgan Engineering & Surveying Minor Subdivision Subdivide property to create three single family residential lots. One copy of site plan. Lonnie Cromwell has the plans. Table to next meeting.
Block 10401 / Lots 5.01 & 5.04 & Block 17802 / Lot 57.01 Jackson Park Environmental Impact Statement
(2 Full copies) (6 copies of narrative portion) All members took a copy of the EIS for review. Mr. Riker has the site plans. Mr. Riker noted that this project has two phases. The northern phase is off of Perrineville Road and the southern phase will be off of W. Veterans Highway. No plans have been received. A request will be sent to the Engineer to submit two full size sets of plans for review. (Signed and sealed).
Block 4201 / Lot 3 Cedar Swamp Road One (1) copy of Preliminary and Final Major Site Plan and One (1) copy of Environmental Impact Statement Matrix Engineering Proposed Self Storage Facility Mr. Riker and Mr. Myer will take plans for review. Mr. Riker and Mr. Myer conducted a site visit at the location and found the area to be a cleared former farm field, there are wet lands as indicated in the rear, no wildlife was observed. The EIS has been received.
Motion by J. Myer, second by J. Riker to send a Letter of No Concern
Myer, K. Skibo, S. DeMarzo, J. Riker โ Ayes
Public - Present this evening are Cameron from Boy Scout Troop 109 and his mother. Mr. Riker explained the functions of the Environmental Commission and discussed some of the projects that the Commission reviews to Cameron and his mother.
New Business Applications
Block 21702 / Lot 32 Block 21801 / Lots 57, 58, 59 & 61 South Hope Chapel Road & Jessica Court
PDS Preliminary and Final Major Subdivision Lonnie Cromwell picked up the plans for this application. Table to the next meeting.
Block 11701 / Lot 9, 25, 26 & 33 Rutherford Estates PDS Amended Final Subdivision (2) Copies Storm Water Report (2) Copies Final Major Subdivision Lonnie Cromwell picked up the plans for this application. Table to the next meeting.
Block 20101 / Lot 30 Sams Road Subdivision Boro Engineering (1) Copy of Site Plan Application Copy of Environmental Impact Statement Kim Skibo and S. DeMarzo will review the plans and report back at the next meeting.
Page 3
Download HTML
Miscellaneous - None
Correspondence โ Miscellaneous correspondence received.
Bills โ Motion to pay Secretary made by J. Myer, second by S. DeMarzo
Commission Vote: - Vote: J. Myer, K. Skibo, S. DeMarzo, J. Riker โ Ayes
Motion to Adjourn made by J. Myer, second by S. DeMarzo
Commission Vote: Vote: J. Myer, K. Skibo, S. DeMarzo, J. Riker โ Ayes
Meeting Adjourned 8:35 pm
Minutes prepared and submitted by:
Kathleen Sevcenko, Secretary