← 454388-1_Pinellas_Bayway_Presentation.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Financial Project Identification Number (FPID): 454388-1
Welcome to the Public Meeting
January 13, 2026
Page 2
Download HTML
Sheen Auditorium
Public Meeting Format
FDOTTampaBay.com
Project Website
https://www.FDOTTampaBay.com /project/1049/454388-1
Page 3
Download HTML
Title VI
This meeting is being conducted in accordance with the Civil Rights Act of 1964. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status.
To express concern(s) relative to the Department's compliance with Title VI, please contact:
Jensen Hackett
FDOT District 7 Title VI Coordinator
11201 North McKinley Drive
Tampa, FL 33612
(813) 975-6283
Jensen.Hackett@dot.state.fl.us
Aldrin Sanders
State Title VI Coordinator
605 Suwannee Street
Tallahassee, FL 32399
(850) 414-4764
Aldrin.Sanders@dot.state.fl.us
Page 4
Download HTML
Project Location and Description
Page 5
Download HTML
Existing Conditions
Page 6
Download HTML
Previous Public Involvement
Public Meeting โ December 10, 2024
47 attendees
Summary of Public Input Received
Signalization
Turn lane improvements
Intersection visibility
Parking and sight distance concerns
Signal timing, signage, and pavement marking enhancements
Requests for improved U-turn and merge configurations
Pedestrian and bicycle safety improvements
Toll plaza signage, lighting, and lane configuration feedback
Page 7
Download HTML
Signal Warrant Analysis
(Did Not Meet Criteria)
Potential Improvements
Optical Speed Bars
MPH
45
Optical Speed Bars
Speed Limit
Pavement Markings
Add Westbound Right Turn Lane
Add Buffered Receiving Lane
for Southbound Left Turns
Temporary Portable Radar
Speed Feedback Sign
BAHIA DEL MAR BLVD
Increased Signage to Direct Pedestrians to Crossing near Bridge
Increased Signage to Direct Pedestrians to Crossing near Bridge
Legend
Short Term Medium Term Long Term
Page 8
Download HTML
Page 9
Download HTML
Page 10
Download HTML
Update Pavement Markings to include Merge Ahead Add overhead signs and pavement markings for lane guidance
Potential Improvements
Add overhead signs and pavement markings for lane guidance
Install "No Stopping" Pavement Markings
Signal Warrant Analysis
(Did Not Meet Criteria)
Add Buffered Receiving Lane
for Northbound Left Turns
Temporary Portable Radar
Speed Feedback Sign
Legend
Short Term
Medium Term
Long Term
Optical Speed Bars
MPH
Speed Limit
Pavement Markings
Speed Limit
Pavement Markings
LANDINGS DR
Page 11
Download HTML
Potential Improvements
Page 12
Download HTML
More Information
Pinellas Bayway Multimodal Feasibility Study 454388-1
Sign-up to receive email alerts for this project
The Pinellas Bayway Multimodal Feasibility Study will evaluate potential corridor improvements along SR 682 between Bahia Del Mar Blvd. and 41st St. in Pinellas County.
The study is based on engaging the communities to develop a clear understanding of citizen concerns along the corridor and conducting a feasibility study to determine possible countermeasures.
To fill out the survey for this study click here: SR 682 Pinellas Bayway Survey (arcgis.com)
Closures
Project Details
Work Type Study/Transportation Planning
Phase Study
Limits
SR 682/Pinellas Bayway
From Bahia Del Mar Blvd
S To 41st S
Length 2.278 Miles
Road 54th Ave
SR 682
Study Manager
Alex Henry
813-975-6772
Alex.Henry@dot.state.fl.us
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
Project Website:
https://www.fdottampabay.com/project/1049/454388-1
Page 13
Download HTML
IF YOU FEEL DIFFERENT
YOU DRIVE DIFFERENT
DRIVE HIGH GET A DUI
Page 14
Download HTML
Thank You
You have now reached the end of the presentation.
Thank you for watching this presentation for the
Pinellas Bayway Feasibility Study.