← 454388-1_Pinellas_Bayway_Presentation.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Financial Project Identification Number (FPID): 454388-1
Welcome to the Public Meeting January 13, 2026
Sheen Auditorium
Public Meeting Format
FDOTTampaBay.com Project Website
https://www.FDOTTampaBay.com /project/1049/454388-1
Title VI
This meeting is being conducted in accordance with the Civil Rights Act of 1964. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status.
To express concern(s) relative to the Department's compliance with Title VI, please contact:
Jensen Hackett FDOT District 7 Title VI Coordinator 11201 North McKinley Drive Tampa, FL 33612 (813) 975-6283 Jensen.Hackett@dot.state.fl.us
Aldrin Sanders State Title VI Coordinator 605 Suwannee Street Tallahassee, FL 32399 (850) 414-4764 Aldrin.Sanders@dot.state.fl.us
Project Location and Description
Existing Conditions
Previous Public Involvement
Public Meeting โ€“ December 10, 2024
47 attendees
Summary of Public Input Received
Signalization
Turn lane improvements
Intersection visibility
Parking and sight distance concerns
Signal timing, signage, and pavement marking enhancements
Requests for improved U-turn and merge configurations
Pedestrian and bicycle safety improvements
Toll plaza signage, lighting, and lane configuration feedback
Signal Warrant Analysis (Did Not Meet Criteria)
Potential Improvements
Optical Speed Bars
MPH 45 Optical Speed Bars
Speed Limit Pavement Markings
Add Westbound Right Turn Lane
Add Buffered Receiving Lane for Southbound Left Turns
Temporary Portable Radar Speed Feedback Sign
BAHIA DEL MAR BLVD Increased Signage to Direct Pedestrians to Crossing near Bridge
Increased Signage to Direct Pedestrians to Crossing near Bridge
Legend
Short Term Medium Term Long Term
Update Pavement Markings to include Merge Ahead Add overhead signs and pavement markings for lane guidance
Potential Improvements
Add overhead signs and pavement markings for lane guidance
Install "No Stopping" Pavement Markings
Signal Warrant Analysis (Did Not Meet Criteria)
Add Buffered Receiving Lane for Northbound Left Turns
Temporary Portable Radar Speed Feedback Sign
Legend Short Term Medium Term Long Term
Optical Speed Bars
MPH Speed Limit Pavement Markings
Speed Limit Pavement Markings
LANDINGS DR
Potential Improvements
More Information
Pinellas Bayway Multimodal Feasibility Study 454388-1
Sign-up to receive email alerts for this project
The Pinellas Bayway Multimodal Feasibility Study will evaluate potential corridor improvements along SR 682 between Bahia Del Mar Blvd. and 41st St. in Pinellas County.
The study is based on engaging the communities to develop a clear understanding of citizen concerns along the corridor and conducting a feasibility study to determine possible countermeasures.
To fill out the survey for this study click here: SR 682 Pinellas Bayway Survey (arcgis.com)
Closures
Project Details
Work Type Study/Transportation Planning
Phase Study
Limits SR 682/Pinellas Bayway From Bahia Del Mar Blvd S To 41st S
Length 2.278 Miles
Road 54th Ave SR 682
Study Manager Alex Henry 813-975-6772 Alex.Henry@dot.state.fl.us
Kris Carson 813-975-6060 Kristen.Carson@dot.state.fl.us
Project Website: https://www.fdottampabay.com/project/1049/454388-1
IF YOU FEEL DIFFERENT YOU DRIVE DIFFERENT DRIVE HIGH GET A DUI
Thank You
You have now reached the end of the presentation.
Thank you for watching this presentation for the Pinellas Bayway Feasibility Study.