← 451246-1_S.R._435_Project_Information_Handout.pdf_sa_U_ved_2ahUKEwjfmZHVxOyXAxW4RTABHa57J2cQFnoECAsQAg_usg_AOvVaw0LHvkkWkmMC4SWmj6RPcBR_fexp_122108196,122108195.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Kirkman Road (S.R. 435) at Old Winter Garden Road (C.R. 526) Intersection Safety Improvements
Orange County
Financial Project Identification (FPID) Number: 451246-1
Project Description
The Florida Department of Transportation (FDOT) plans to make improvements at the intersection of Kirkman Road (State Road (S.R.)) 435) and Old Winter Garden Road (County Road (C.R.)) 526) in Orlando. The purpose of the project is to enhance safety at the intersection.
The project includes
reconstructing and upgrading
the existing traffic signal to
improve driver visibility. The
project also includes repaving
the intersection, updating
signage and pavement
markings, and upgrading curb
ramps, as needed, to meet the
Americans with Disabilities Act
(ADA) standards.
The improvements are a result of an intersection safety study from 2022.
Contact Information:
Bita Hooman
FDOT Project Manager
386-943-5645
Bita.Hooman@dot.state.fl.us
CFLRoads.com
Project Status & Estimated Costs*
| Design: | Ongoing - early 2027 | $ 583,000 |
|---|---|---|
| Right of Way: | Within existing | โ |
| Construction: | Funded - spring 2027 | $ 1.3 million |
*subject to change