← 450782-1_U.S._1_Project_Information_Handout_REV2.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

U.S. 1 (Ridgewood Avenue) Improvements From Beville Road (S.R. 400) to North of Fairview Avenue
Volusia County
Financial Project Identification (FPID) Number: 450782-1
Project Description
The Florida Department of Transportation (FDOT) is planning a maintenance resurfacing project on U.S. 1 (Ridgewood Avenue) from Beville Road (State Road (S.R.)) 400) to north of Fairview Avenue in the City of Daytona Beach.
As part of the resurfacing project, FDOT is taking the opportunity to address some safety concerns along the corridor for bicyclists and pedestrians. The early designs are proposing strategies such as buffered bike lanes and signalized pedestrian midblock crossings.
The proposed 7-foot--wide buffered bike lanes will provide extra space between bicyclists and motor vehicles. In addition to the buffered bike lanes, four new midblock crosswalks with pedestrian-activated signals called Pedestrian Hybrid Beacons (PHBs) are proposed near Osceola Avenue, south of Shady Place, between South Street and Cedar Street, and near Live Oak Avenue. The crossing near Shady Place requires northbound left-turn access be restricted to Shady Place.
Proposed Buffered Bike Lane
Proposed Buffered Bike Lane
Contact Information:
Project Status & Estimated Costs*
Lori Trebitz, P.E. FDOT Project Manager 386-943-5538 Lori.Trebitz@dot.state.fl.us
Design:Ongoing - completed spring 2026514,000**
Right of Way:Within existing--
Construction:Funded - summer 20269.2 Million
CFLRoads.com
*subject to change** in-house design
GO Beacon remains dark until activated by someone.
SLOW DOWN People walking have activated push button.
PREPARE TO STOP Watch for people walking, biking, & rolling!
STOP! People are crossing.
STOP Proceed with caution if clear.
www.AlertTodayFlorida.com