S.R. A1A RESILIENCY PLAN FLAGLER AND VOLUSIA COUNTIES

Financial Project Identification (FPID) Numbers: 452443-1 and 452444-1

Project Update

Representatives from the Florida Department of Transportation (FDOT), Flagler County, the City of Flagler Beach, and Volusia County, are exploring options to repair and strengthen approximately 13 miles of State Road (S.R.) A1A in Flagler and Volusia counties. Specifically, the mission of the S.R. A1A Resiliency Strike Team is to make the Scenic S.R. A1A System, including the roadway, beaches and dunes, serviceable, functional, and resilient for decades to come.

In addition to staff from the FDOT and local governments, the team includes representatives from the U.S. Army Corps of Engineers and Florida Department of Environmental Protection. The team is also coordinating with other state and federal agencies.

The S.R. A1A Strike Team has enlisted the help of coastal engineers to survey the existing conditions, understand the most vulnerable areas and develop a list of options for consideration. The engineers and strike team members have reviewed and evaluated options based on several factors, including constructability, environmental and wildlife impacts, maintenance needs, aesthetics, cost/cost sharing, permitting needs, recreation, resiliency, parking and public access.

There are four options currently under consideration: a buried seawall, dune renourishment, granite revetment and a secant wall. The team expects a combination of options will be used based on different needs throughout the corridor. A map of the most vulnerable areas of S.R. A1A is shown on the back of the flyer.

The purpose of the Community Listening Sessions being held on January 19 in Volusia County and January 24 in Flagler County is to hear feedback about the options, as well as ideas that perhaps the team had not considered. Following the listening sessions, the consulting engineers will work to develop concept plans by March 2023. Those plans will be used to develop budgets and seek funding for future projects.

The S.R. A1A Resiliency Strike Team will continue to provide updates throughout the effort. If you would like to be added to the email distribution list, email D5-A1AFlaglerVolusia@dot.state.fl.us.

Tentative Schedule

Contact Information:

Catalina Chacon, P.E. FDOT Strategic Initiatives Manager 386-943-5039 Catalina.Chacon@dot.state.fl.us

Ty Garner FDOT Project Manager 386-943-5299 Ty.Garner@dot.state.fl.us