← 900.pdf_v_d11152022.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
US 98 (Ponce De Leon Blvd) Repaving from N Landfill Road to the Citrus County Line
440064-1-52-01
| Project Details | |
| Work Type | Repaving |
|---|---|
| Phase | Completed |
| Limits | US 98 from North LandfillRoad to South of Citrus CountyLine |
| Project Start | August 8, 2022 |
| Length | 2.15 miles |
| City | Brooksville |
| County | Hernando |
| Road | Ponce De LeonBoulevardUS 98 |
| ConstructionCost | $2 million |
| EstimatedCompletion | November 13,2022 |
| Contractor | Ajax PavingIndustries ofFlorida LLC |
Contact Information
Project Information
Dave Hoover 352-848-2600
David.Hoover@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This project repaved US 98 (Ponce De Leon Blvd.) between Landfill Road and the Citrus County line (about 7 tenths of a mile northwest of the Suncoast Parkway).
Construction has been completed and the job was final-accepted on November 13, 2022.