← 493_v_10302026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
S.R. 544 (Havendale Boulevard) Sidewalks 446535-1
| Project Details | |
| Work Type | Sidewalk |
|---|---|
| Phase | Construction |
| Limits | Lake Blue Drive to 26th Street NW |
| Project Start | Mid 2026 |
| City | Winter Haven |
| County | Polk |
| Road | SR 544 |
| Construction Cost | $1.2 million |
| Estimated Completion | Late 2026 |
Contact Information
Communications Team
Sandra Mancil 863-519-4116
Sandra.Mancil@dot.state.fl.us
About
The Florida Department of Transportation is starting a project to enhance pedestrian safety and accessibility along Havendale Boulevard in Winter Haven. As part of the project, crews will perform the following work.
Install new 6-foot-wide sidewalks on the south side of Havendale Boulevard from Lake Blue Drive to 26th Street Northwest
Upgrade pedestrian signal equipment
Add High-visibility crosswalks at side streets and intersections
Mill and resurface side street entrances
Reconstruct some concrete driveways and curb ramps
Improving turning radii at some side streets