SR 699 (G) 120th Ave and 121st Ave 254
| Project Details | |
| Work Type | Pedestrian Safety Improvements |
|---|---|
| Phase | Completed |
| Limits | from 120th Ave to 121st Ave |
| Project Start | August 16, 2021 |
| City | Treasure Island |
| County | Pinellas |
| Road | Gulf Boulevard SR 699 |
| Construction Cost | $141,116 |
| Estimated Completion | Late 2021 |
| Contractor | Cone and Graham, Inc |
About
ALL WORK ASSOCIATED WITH THIS PROJECT WAS COMPLETED ON SEPTEMBER 27, 2021.
This design-build project is installing a mid-block crosswalk with ground mounted Rectangular Rapid Flashing Beacons (RRFB) at Gulf Boulevard (SR 699) between 120th Avenue and 121st Avenue in Treasure Island.
Contact Information
Project Information
Randy Aebersold 727-575-8300
Randall.Aebersold@dot.state.fl.us
Improvements include:
- adding a pedestrian refuge island within the mid-block crosswalk
- constructing curb and gutter, sidewalk and curb ramp
- installing lighting, signing, pavement marking and pedestrian features as necessary
Status: Construction is estimated to finish late 2021