← 934.pdf_v_d11252024.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
I-275 Repaving from the Skyway Bridge to south of Pinellas Point Drive 445886-1-52-01
Project Details
Work TypeRepaving
PhaseCompleted
LimitsFrom north end of Skyway Bridge to south of Pinellas Point Dr.
Project StartJanuary 3, 2024
Length4.3 miles
CitySt. Petersburg
CountyPinellas
RoadI-275 Skyway Bridge
Construction Cost$8 million
Estimated CompletionLate 2024
ContractorPreferred Materials Inc.
About
As of November 21, 2024, all construction activities associated with this project have been completed.
This project is repaving travel lanes, shoulders ramps and frontage roads on I-275 between the Skyway Bridge and Pinellas Point Drive. The ramps and frontage roads at the north rest area will also be repaved as part of this project.
Construction is underway and expected to be complete in late 2024.
Contact Information
Project Information
Maddie Griffin 727-575-8334
roadwork@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us