Tampa Bay
Florida Department of Transportation
I-275 Repaving from the Skyway Bridge to south of Pinellas Point Drive 445886-1-52-01
| Project Details | |
| Work Type | Repaving |
|---|---|
| Phase | Completed |
| Limits | From north end of Skyway Bridge to south of Pinellas Point Dr. |
| Project Start | January 3, 2024 |
| Length | 4.3 miles |
| City | St. Petersburg |
| County | Pinellas |
| Road | I-275 Skyway Bridge |
| Construction Cost | $8 million |
| Estimated Completion | Late 2024 |
| Contractor | Preferred Materials Inc. |
About
As of November 21, 2024, all construction activities associated with this project have been completed.
This project is repaving travel lanes, shoulders ramps and frontage roads on I-275 between the Skyway Bridge and Pinellas Point Drive. The ramps and frontage roads at the north rest area will also be repaved as part of this project.
Construction is underway and expected to be complete in late 2024.