← 1188.pdf_v_d03032026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
SR 39A (Paul Buchman Highway) Resurfacing from north of I-4 Interchange to SR 39 (Alexander Street) 447974-1-52-01
| Project Details | |
| Work Type | Resurfacing |
|---|---|
| Phase | Design |
| Limits | SR 39A (Paul Buchman Highway) Resurfacing from north of I-4 Interchange to SR 39 (Alexander Street) |
| Length | 2.18 miles |
| City | Plant City |
| County | Hillsborough |
| Road | Paul Buchman Highway SR 39A |
Contact Information
Design Manager
Helena Ly 813-975-3690
Helena.Ly@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing the roadway pavement on SR 39A (Paul Buchman Hwy) from north of I-4 interchange to SR 39 (Alexander Street) in Hillsborough County.
In addition, this project will also include signing, pavement markings, minor signalization improvements at Sam Allen Road intersection, and minor drainage improvements.
Construction is currently anticipated to begin Spring 2028.