← 357_v_09182026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON

Southwest Florida Florida Department of Transportation

US 98 from south of Griffin Road to Sharon Drive 445468-1

Project Details
Work TypeResurfacing
PhaseConstruction
Limitssouth of GriffinRoad to SharonDrive
Project StartLate 2024
CityLakeland
CountyPolk
RoadI-4US 98
ConstructionCost$12.5 million
Estimated CompletionMid 2026

Contact Information

Communications Team

Sandra Mancil

863-519-4116

Sandra.Mancil@dot.state.fl.us

About

US 98 from south of Griffin Road to Sharon Drive: Construction project: The FDOT is making safety improvements to US 98 from south of Griffin Road to Sharon Drive in Lakeland. The project includes the following enhancements:

  • milling and resurfacing US 98 from south of Griffin Road to Sharon Drive
  • repairing and improving drainage
  • enhancing lighting at the intersections
  • emphasizing bike lanes by painting them green to improve visibility
  • adding special emphasis crosswalks at Griffin Road, Pyramid Parkway, across US 98 south of the interstate and across all the I-4 ramps
  • adding pedestrian fencing in the median between Pyramid Parkway and the crosswalk south of the I-4 ramps to channel pedestrians safely to the crossings
  • changing the way traffic merges from the slip lane at Pyramid Parkway onto US 98
  • replacing unnecessary asphalt with green space at the intersection of Pyramid Parkway and US 98 as a traffic calming effort and for beautification
  • adjusting the stop bar past the Burger King driveway to improve safety at Pyramid Parkway on the west side of US 98
  • upgrading and adjusting signal equipment to improve visibility for motorists when making left turns at Griffin Road and at Crevasse Street
  • adding signs on northbound US 98 identifying the I-4 ramps