← 412.pdf_v_d04072020.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
Hillsborough County Bridge Painting Various Locations 437541-1-52-01
Project Details
| Project Details | |
| Work Type | Bridge Painting |
|---|---|
| Phase | Completed |
| Limits | US 92, SR 574 and US 41B |
| Project Start | October 2019 |
| City | Ruskin Tampa |
| County | Hillsborough |
| Road | Hillsborough Avenue MLK Blvd SR 574 Tamiami Trail US 41 US 92 |
| Construction Cost | $870,000 |
| Estimated Completion | Summer 2020 |
| Contractor | Seminole Equipment, Inc. |
Contact Information
Project Information
Salem Dhouib 813-612-3200
Salem.Dhouib@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
FINAL ACCEPTED ON APRIL 3, 2020
This project will clean and paint the steel elements of three bridges in Hillsborough County.
They include;
US 92 (Hillsborough Ave) over the CSX railroad tracks between 50th and 56th streets in Tampa.
SR 574 (Dr. MLK Blvd) over the Hillsborough River In Tampa.
US 41B (Tamiami Trail) over CSX railroad tracks between College Ave and 12th Ave in Ruskin.
Construction activities are expected to finish in the summer of 2020.