N. Turkey Oak Dr. Sidewalk from SR 44 to Bay Avenue 441104-1-52-01

Project Details
Work TypeSidewalk
PhaseCompleted
Limitsfrom SR 44 to Bay Avenue
Project StartJuly 12, 2021
CityCrystal River
CountyCitrus
Construction Cost$1.3 million
Estimated CompletionSpring 2022
ContractorC.W. Roberts Contracting, Inc.

About

All work has been completed and the project was final-accepted from the contractor on April 25, 2022.

The project added a 5 foot sidewalk along N. Turkey Oak Drive between SR 44 and Bay Avenue in the vicinity of Crystal River High School.

Contact Information

Project Information

Austin Petersen

352-848-2600

Austin.Petersen@dot.state.fl.us

Media Contact

Kayla Mejia

813-975-6060

Kayla.Mejia@dot.state.fl.us

Other project improvements included:

  • The intersections of Turkey Oak Drive / SR 44 and Turkey Oak Drive / N. Citrus Avenue were repaved. The pedestrian crossings were improved and pedestrian signals were replaced at each of these intersections.
  • Widened the turn radius for the eastbound to southbound and southbound to westbound traffic movements at the intersection of N. Turkey Oak Drive and N. Citrus Avenue.
  • Resurfaced or reconstructed driveway connections along N. Turkey Oak Drive from Woodbury Court to SR 44.