← I4_Wildlife_Crossing_Newsletter.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
I-4 Wildlife Crossing Design Project
Polk County, Florida
Financial Project ID: 201214-8-52-01
Virtual Public Workshop (May 25, 2021 through June 15, 2021)
The Florida Department of Transportation (FDOT), District One, is hosting a Virtual Public Workshop to review design plans for the I-4 wildlife crossing located in northeast Lakeland. The purpose of the workshop is to present project information and to receive public input regarding the proposed design plans.
The workshop is being held completely online with no live component. Workshop materials will be posted to the project website (www.swflroads.com/i4/wildlifecrossing) beginning on Tuesday, May 25, 2021 and may be viewed through Tuesday, June 15, 2021. Hard copies of the workshop materials are available for pick up at the Lakeland Public Library โ Larry R. Jackson Branch, located at 1700 N. Florida Avenue, Lakeland, FL 33805 during regular business hours between May 25, 2021 and June 15, 2021. The library's main phone number is (863) 834-4288.
Ways to Share Your Comments
After reviewing the workshop materials online, comments may be submitted in three different ways:
Through the project website ( www.swflroads.com/i4/wildlifecrossing); or
Emailing Doug Burkhart, P.E., the FDOT Project Manager at Doug.Burkhart@dot.state.fl.us; or
Mailing comments to Doug Burkhart, P.E. at FDOT District One, P.O. Box 1249, Bartow, FL 33831.
Please note that comments must be received or postmarked by June 15, 2021 in order to be included in the workshop summary, which will be posted to the project website (www.swflroads.com/i4/wildlifecrossing) by mid-July 2021 (about 30 days after the comment period ends).
FDOT solicits public participation without regard to race, color, national origin, age, sex, religion, disability or family status. People who require special accommodations under the Americans with Disabilities Act or who require translation services (free of charge) should contact Cynthia Sykes, District One Title VI Coordinator, by phone at (863) 519-2287 or by email at Cynthia.Sykes@dot.state.fl.us at least seven days prior to the Virtual Public Workshop.
Project Contact Information
Doug Burkhart, P.E.
Project Manager
Florida Department of Transportation (FDOT)
P.O. Box 1249
Bartow, Florida 33831
Phone: (850) 536-8539
Email: Doug.Burkhart@dot.state.fl.us
Project Website: www.swflroads.com/i4/wildlifecrossing
Page 2
Download HTML
I-4 Wildlife Crossing
Design Project
Financial Project ID: 201214-8-52-01
Wildlife Crossings Overview
As part of the 1998 Environmental Assessment (EA) for I-4 from the Hillsborough County Line to the Osceola County Line, the Florida Department of Transportation (FDOT) committed to the construction of a wildlife crossing near Saddle Creek and the Tenoroc Management Area. Coordination with the Florida Fish and Wildlife Conservation Commission (FWC) and U.S. Fish and Wildlife Service (FWS) was conducted to determine the appropriate wildlife crossing location alternatives. The preferred location for the Saddle Creek/Tenoroc Management Area wildlife crossing is located approximately 1.6 miles east of the I-4/SR 33 interchange. The wildlife crossing consists of a 44-foot wide bridge crossing over I-4. The project is approximately 1,700 feet in length.
Next Steps After Workshop
Design completion: December 2023
ROW acquisition: Fall 2021
Construction: Not funded
Project Concept
Project Location Map
Project Website: www.swflroads.com/i4/wildlifecrossing