← 1071.pdf_v_d01202026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON
Page 1
Download HTML
US 92 (4th Street N) Repaving from 3rd Street N to 30th Avenue N 447919-1
| Project Details | |
| Work Type | Repaving |
|---|---|
| Phase | Design |
| Limits | from 3rd Street N to 30th Avenue N |
| Length | 1.5 Miles |
| City | St. Petersburg |
| County | Pinellas |
| Road | SR 687 US 92 |
Contact Information
Design Manager
Jason Jordan
813-975-6169
Jason.Jordan@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This project will resurface 1.5 miles of US 92 (4th Street N) in St. Petersburg.
ADA facility upgrades, mid-block crossing reconstruction, left-turn movement improvements and signing and pavement marking upgrades are also included with this project.
The project is currently in the design phase. Construction is anticipated to begin in summer 2027.