← 1238.pdf_v_d07242026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
US 98 Resurfacing from south of Prairie Drive to US 301 449168-1-52-01
| Project Details | |
| Work Type | Milling and Resurfacing |
|---|---|
| Phase | Design |
| Limits | US 98 from south of Prairie Drive to US 301 |
| Length | 1.015 miles |
| City | Dade City |
| County | Pasco |
| Road | US 98 |
Contact Information
Design Manager
Dinyar Sharifabad
813-975-6172
Dinyar.Sharifabad@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to preserve and extend the life of the existing pavement through resurfacing along this section of US 98 in Pasco County.
Other improvements include signing and pavement marking, signalization, and lighting upgrades.
Construction is currently anticipated to begin Summer 2028.