← 938.pdf_v_d10132025.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
US 41 (Florida Ave) Arterial Traffic Management System Upgrades from Kennedy Blvd to Bearss Ave 443444-2-52-01
| Project Details | |
| Work Type | Arterial Traffic Management and Intelligent Transportation System Upgrades |
|---|---|
| Phase | Completed |
| Limits | From Kennedy Blvd to Bearss Ave |
| Project Start | March 20, 2023 |
| Length | 3.2 miles |
| City | Tampa |
| County | Hillsborough |
| Road | Florida Avenue (Hillsborough) SR 685 USB 41 |
| Construction Cost | $29.2 million |
| Estimated Completion | Fall 2025 |
| Contractor | Highway Safety Devices Inc. |
About
All construction activities associated with this project were completed on Friday, October 3, 2025.
This design build project installed fiber optic communications tools and hardware along Florida Avenue between Kennedy Blvd and Bearss Avenue to assist with traffic management in Tampa.
Contact Information
Project Information
Maricelle Venegas 813-975-6204 roadwork@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us