← 1181.pdf_v_d10292026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
SR 60 (E Adamo Drive) Resurfacing from east of N 22nd Street to east of US 41 451997-1-52-01
| Project Details | |
| Work Type | Milling and Resurfacing |
|---|---|
| Phase | Design |
| Limits | from east of N 22nd Street to east of US 41 |
| Length | 2.4 miles |
| City | Tampa |
| County | Hillsborough |
| Road | Adamo Drive SR 60 |
Contact Information
Design Manager
Dinyar Sharifabad
813-975-6172
Dinyar.Sharifabad@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of SR 60 in Hillsborough County.
Construction is currently anticipated to begin in summer of 2029.