← 425.pdf_v_d09292026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
US 19 Interchange Improvement at SR 694 (Gandy Boulevard/Park Boulevard) 435914-2-52-01
| Project Details | |
| Work Type | Interchange Improvement |
|---|---|
| Phase | Design |
| Limits | at SR 694 (Gandy Boulevard/Park Boulevard) |
| City | Pinellas Park |
| County | Pinellas |
| Road | Gandy Boulevard SR 694 US 19 |
Contact Information
Design Manager
Omar Chehab, P.E.
813-975-6468
Omar.Chehab@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
A PD&E re-evaluation study was performed on this corridor and provides improvement recommendations. Due to funding, these recommended improvements will be implemented in phases. The first phase will incorporate widening US 19 at SR 694 (Gandy Boulevard/Park Boulevard) and on Gandy Boulevard to provide dual left-turn lanes southbound to eastbound. Operational improvements to the off-ramps from Gandy Boulevard onto US 19 will also be addressed. Bicycle and pedestrian accommodations will be implemented where feasible.
In addition to the turn lanes, this project will look at signaling the following intersections:
US 19 and Gateway Center Boulevard
Park Boulevard and 40th Street North
Future projects will address the remaining PD&E re-evaluation recommendations.
Design is currently on hold. Construction is not currently funded.