← 523.pdf_v_d07072021.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
US 41B (22nd St. Causeway) Bridge Repairs over McKay Bay 439554-1-52-01
| Project Details | |
| Work Type | Bridge Repairs |
|---|---|
| Phase | Completed |
| Limits | bridge over McKay Bay |
| Project Start | May 3, 2021 |
| Length | 0.3 miles |
| City | Tampa |
| County | Hillsborough |
| Road | 22nd Street Causeway Boulevard (Hillsborough) US 41 Business |
| Construction Cost | $357,252 |
| Estimated Completion | Summer 2021 |
| Contractor | Bridge Masters Construction, LLC |
About
Completed and accepted by FDOT on Friday, July 2, 2021.
This project applied a sealer to the concrete bridge deck to protect the roadway.
Construction was expected to finish summer of 2021.
Contact Information
Project Information
Andrew Williams
813-612-3200
Andrew.Williams@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us