← 448735-1_-_U.S._441_Leesburg_handout.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

OPERATIONAL IMPROVEMENTS
U.S. 441 from Mills Street to College Drive
Lake County
PROJECT DESCRIPTION
The Florida Department of Transportation (FDOT) is implementing operational improvements on U.S. 441 (State Road (S.R.) 44/S.R. 500/East Main Street/North Boulevard) from Mills Street to College Drive in Leesburg.
CONTRACTOR C.W. Roberts Contracting, Inc.
PROJECT COST $14.4 million
The project will resurface all travel lanes, shoulders, and side street turnouts within the project limits.
Other planned improvements include:
PROJECT START October 2025
Upgrades to traffic signals and improved lighting for pedestrian safety at the intersections of U.S. 441 and S.R. 44 (East Dixie Avenue) and U.S. 441 and County Road (C.R.) 44.
ESTIMATED COMPLETION Summer 2026
Construction of a 6-foot-wide sidewalk to fill gaps from Mills Street to S.R. 44, providing sidewalk connectivity.
Extension of the dual left turn lanes at U.S. 441 and S.R. 44, and closure of the existing directional median at Nichols Drive.
Addition of a dedicated right-turn lane at the RaceTrac gas station to improve traffic flow.
Extension of the left turn lane to North Lake Avenue for better traffic flow and enhanced safety. In addition, curbs and curb ramps at all side streets will be upgraded to meet current Americans with Disabilities Act (ADA) standards, and landscaping enhancements will be provided along the corridor.
FOR QUESTIONS, CONCERNS, OR PROJECT UPDATES Send a request to:
Joe Callahan Community Outreach Specialist 352-326-7744 joe.callahan@dot.state.fl.us
WHAT TO EXPECT
Residents and motorists should expect daytime and overnight single-lane closures, as well as overnight double-lane closures from 7 p.m. to 7:30 a.m. Motorists should also anticipate areas of uneven pavement within the project limits, a common condition during construction when the contractor applies multiple asphalt layers in phases. These roadway conditions are temporary and will improve gradually as the project progresses.
While in a work zone, motorists are strongly encouraged to exercise caution and reduce speed to ensure the safety of everyone on the roadway. The project timeline is subject to change and may be adjusted due to inclement weather or other unforeseen circumstances. For the most current project details and lane closure information, please visit FDOT's Central Florida website at www.cflroads.com. CONTRACTOR C.W. Roberts Contracting, Inc.
For more information, can the QR code above or visit the project website at www.cflroads.com/project/448735-1
Follow us on social media
OPERATIONAL IMPROVEMENTS
Financial Project Identification (FPID) No.: 448735-1
U.S. 441 from Mills Street to College Drive
Lake County
Follow us on social media