← 1191.pdf_v_d03172026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
US 41 (Melburne Boulevard) Resurfacing from west of N 50th Street to 40th Street
411328-1-52-01
| Project Details | |
| Work Type | Resurfacing |
|---|---|
| Phase | Design |
| Limits | US 41 (Melburn Boulevard) from west of N 50th Street to 40th Street |
| Length | 0.82 miles |
| City | Tampa |
| County | Hillsborough |
| Road | Melburn Boulevard SR 599 US 41 |
About
The purpose of the project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of US 41 (Melburne Boulevard) in Tampa.
Construction is currently anticipated to begin Spring 2028.
Contact Information
Design Manager
Digvijay Patil 813-975-6176
Digvijay.Patil@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us