← 395.pdf_v_d08172022.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Alt US 19, SR 687, SR 699, SR 688, SR 60, SR 586, SR 580 Highway Lighting Upgrades in Pinellas County 439829-5-52-01
| Project Details | |
| Work Type | Highway Lighting Upgrades |
|---|---|
| Phase | Completed |
| Limits | Varies by location |
| Project Start | October 2019 |
| City | Clearwater Dunedin Largo Oldsmar Palm Harbor St. Pete Beach St. Petersburg Treasure Island |
| County | Pinellas |
| Road | 4th Street 5th Avenue North Alt US 19 Gulf Boulevard Gulf To Bay Boulevard (Pinellas) SR 580 SR 60 SR 687 SR 688 SR 699 Tampa Road Ulmerton Road Walsingham Road |
| Construction Cost | $409,385 |
| Estimated Completion | Summer 2020 |
| Contractor | PowerCore, Inc. |
Contact Information
Project Information
Sarah Gansz 737-575-8300
Sarah.Gansz@dot.state.fl.us
About
FINAL ACCEPTED ON TUESDAY, MAY 5, 2020
This project will upgrade the highway lighting at numerous intersections throughout Pinellas County.
List of intersections:
Alt. US 19 (3 intersections) between 8th Street North and 16th Street North in St. Petersburg
SR 687 (17 intersections) between 4th Avenue South and Brighton Bay in St. Petersburg
SR 699 (11 intersections) between Pinellas Bayway in St. Pete Beach and 117th Avenue in Treasure Island
SR 688 (22 intersections) between Hamlin Boulevard in Largo and Feather Sound Drive in St. Petersburg
SR 60 (4 intersections) between US 19 and Hampton Road in Clearwater
SR 586 (10 intersections) between Alt 19/Bayshore in Dunedin and Tampa Road in Oldsmar
SR 580 (15 intersections) between Patricia Avenue in Dunedin and McMullen Booth Road in Palm Harbor
Construction is expected to finish in the summer of 2020.
Page 2
Download HTML
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us