← 999.pdf_v_d12152025.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
SR 586 (Curlew Road) Drainage Improvements from US 19 to Countryside Boulevard
452125-2-52-01
| Project Details | |
| Work Type | DrainageImprovements |
|---|---|
| Phase | Design |
| Limits | from US 19 to CountrysideBoulevard |
| Length | 1.258 Miles |
| City | Safety Harbor |
| County | Pinellas |
| Road | Curlew RoadSR 586 |
Contact Information
Design Manager
Melissa Mulvaney
813-975-6783
Melissa.Mulvaney@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This project will replace the drainage system along SR 586 (Curlew Road) from US 19 to Countryside Boulevard in Pinellas County.
This project is currently in the design phase. Construction is anticipated to begin in 2026.