← 1124.pdf_v_d04102026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
US 92 (Gandy Boulevard) Resurfacing from Brighton Bay Boulevard to Gandy Bridge
451238-1-52-01
| Project Details | |
| Work Type | Resurfacing |
|---|---|
| Phase | Design |
| Limits | US 92 (Gandy Boulevard) from Brighton Bay Boulevard to Gandy Bridge |
| Length | 3.4 miles |
| City | St. Petersburg |
| County | Pinellas |
| Road | Gandy Boulevard SR 600 US 92 |
About
The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of Gandy Boulevard in Pinellas County.
Contact Information
Design Manager
Jason Jordan
813-975-6169
Jason.Jordan@dot.state.fl.us
In addition to resurfacing, the project also includes signing and pavement markings, ADA facility upgrades and, driveway modifications.
Other improvements include median modifications to accommodate a third westbound lane from San Fernando Drive.
Construction is currently anticipated to begin in Spring 2028.
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us