← 1171.pdf_v_d04092026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON
Page 1
Download HTML
SR 569 (N 39th Street) Resurfacing from SR 60 to E 15th Avenue 451452-1-52-01
| Project Details | |
| Work Type | Resurfacing |
|---|---|
| Phase | Design |
| Limits | SR 569 (N 39th Street) from S.R. 60 (E Adamo Drive) to E 15th Avenue |
| Length | 0.8 miles |
| City | Tampa |
| County | Hillsborough |
| Road | SR 569 |
Contact Information
Design Manager
Digvijay Patil, P.E.
813-975-6176
Digvijay.Patil@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The purpose of the project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of State Road (S.R.) 569 in Tampa.
Construction is currently anticipated to begin in Spring 2028.