← 385.pdf_v_d08142026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON
Page 1
Download HTML
Henry Canal Drainage Improvement from Lois Avenue to Church Avenue 422929-7-52-01
| Project Details | |
| Work Type | DrainageImprovement |
|---|---|
| Phase | Design |
| Limits | Henry CanalDrainage fromLois Avenue toChurch Avenue |
| Length | 0.37 miles |
| City | Tampa |
| County | Hillsborough |
Contact Information
Design Manager
Digvijay Patil
813-975-6176
Digvijay.Patil@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The project will re-grade and stabilize the canal slopes along the Henry Street canal between Lois and Church avenues. Activities in this contract will resolve the slope stability and erosion issues along the drainage canal.
The project is currently in design.