← 218.pdf_v_d08062021.pdf

Rebuilt HTML — PaddleOCR-VL (Baidu)

Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay · view JSON

I-275 (Sunshine Skyway Bridge) Lighting 432270-1-52-01

Project Details
Work TypeLighting
PhaseCompleted
LimitsI-275 Sunshine Skyway Bridge
Project StartNovember 2017
CitySt. Petersburg
CountyPinellas
RoadI-275 Skyway Bridge Sunshine Skyway
Construction Cost$15.6 million
ContractorM & J Construction Company

Contact Information

Project Information

David Gillett 727-575-8300

david.gillett@dot.state.fl.us

Media Contact

Kayla Mejia 813-975-6060

Kayla.Mejia@dot.state.fl.us

About

As of June 30, 2021, all work associated with this project has been completed.

The Sunshine Skyway Bridge is the gateway to Tampa Bay and the flagship bridge of Florida. The Skyway Lighting Project is a unique enhancement, unlike any other in the world. The project will stand for the Tampa Bay region as an inspiration for residents and all who visit.

This project will install decorative lighting on the Sunshine Skyway Bridge, creating a visual aesthetic and enhancing safety and security by providing more light to the underside of the bridge.

The lighted section will include all the sloped and main span of the bridge for a total of 8,860 feet (1.7 miles) along the bridge.

Column Lights: The wide faces of all columns will be illuminated by floodlighting fixtures mounted to the underside of the deck and box girders, washing along the height of each column, fading out as it gets toward the water line.

Profile Lights: Along the length of the main span and high level approaches, “necklace” lights will be mounted on brackets that allow the fixtures to be directed straight out.