← 1181.pdf_v_d01202026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
S.R. 60 (E. Adamo Drive) Resurfacing from east of N. 22nd Street to east of U.S. 41451997-1-52-01
| Project Details | |
| Work Type | Milling and Resurfacing |
|---|---|
| Phase | Design |
| Limits | S.R. 60 (E. Adamo Drive) from east of N. 22nd Street to east of U.S. 41 |
| Length | 2.4 miles |
| City | Tampa |
| County | Hillsborough |
| Road | Adamo Drive SR 60 |
Contact Information
Design Manager
Dinyar Sharifabad
(813) 975-6172
Dinyar.Sharifabad@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla Mejia@dot.state.fl.us
Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of State Road (S.R.) 60 in Hillsborough County.
Construction is currently anticipated to begin in Spring 2028.