← 1123.pdf_v_d04222026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
Scott Street Pavement Rehabilitation from Morgan Street to Jefferson Street 447616-1-52-01
Project Details
Project Details
Work TypeAdd Lanes and Rehabilitate Pavement
PhaseDesign
LimitsScott Street from Morgan Street to Jefferson Street
Length0.3 miles
CityTampa
CountyHillsborough
RoadScott Street
Contact Information
Design Manager
Helena Ly 813-975-3690
Helena.Ly@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This project will modify the Scott Street interchange to enhance safety and improve traffic operations. Planned improvements include:
Minor widening along the northbound I-275 and eastbound I-4 on-ramps from Scott Street
Milling and resurfacing, plus widening along Scott Street from East of Morgan Street to the I-275 interchange
Concrete pavement rehabilitation of the on-ramps
Replacement of traffic signals and signage
Upgraded roadway lighting
Sidewalk improvements for enhanced pedestrian access