← 323.pdf_v_d08172021.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
SR 583 (56th Street) Intersection Improvement at Whiteway Drive 439460-1-52-01
| Project Details | |
| Work Type | Intersection Improvement |
|---|---|
| Phase | Completed |
| Limits | SR 583 (56th Street) at Whiteway Drive |
| Project Start | March 2021 |
| City | Temple Terrace |
| County | Hillsborough |
| Road | 56th Street |
| Construction Cost | $874,873.00 |
| Estimated Completion | Fall 2021 |
| Contractor | Traffic Control Devices, Inc. |
About
As of Sunday, August 15, 2021, all construction activities associated with this project are now complete.
This project replaced the traffic signal with a hurricane resistant signal at the intersection of 56th Street and Whiteway Drive in Temple Terrace.
Contact Information
Project Information
Salem Dhouib 813-612-3200
Salem.Dhouib@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us