Rebuilt HTML โ PaddleOCR-VL (Baidu)
Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON
SR 583 (56th/50th St) Corridor Study 445651-1
| Project Details | |
| Work Type | SR 583 (56th/50th St) Corridor Study |
|---|---|
| Phase | Completed |
| Limits | from SR 618 (Selmon Expressway) to Fletcher Ave |
| Length | 5.5 miles |
| City | Tampa Temple Terrace |
| County | Hillsborough |
| Road | 50th Street 56th Street SR 583 |
Contact Information
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The SR 583 (56th/50th Street) Corridor Study was performed to evaluate possible changes to improve safety, operations, and connectivity along the corridor. The SR 583 corridor from Slight Avenue to Busch Boulevard/Bullard Parkway was identified by the Hillsborough TPO as a Vision Zero corridor, meaning it was identified as a corridor with a high number of severe crashes leading to fatalities and incapacitating injuries. A primary focus of this corridor study was to identify safety solutions and countermeasures to improve the safety for all users.