← 805.pdf_v_d05272025.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
SR 60 Repaving from Clarence Gordon Jr. Road to Polk County Line 441661-1-52-01
Project Details
Work TypeRepaving
PhaseCompleted
Limitsfrom Clarence Gordon Jr. Road to the Polk County Line
Project StartDecember 7, 2023
Length3.4 miles
CityHopewell Plant City
CountyHillsborough
RoadSR 60
Construction Cost$13.9 million
Estimated CompletionSpring 2025
ContractorC.W. Roberts, Inc.
About
All construction activities associated with this project were completed on Monday, May 19, 2025.
This project repaved State Road 60 from east of Clarence Gordon Jr. Road to Polk County Line Road in Hillsborough County.
In addition to repaving SR 60, a directional median was installed at Horton Road along with sidewalks on the northside of the road.
Contact Information
Project Information
Maricelle Venegas 813-975-6204
RoadWork@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us